Tuesday, 29 November 2011

Long Time No Post

It's been a while since our last post and a lot has been happening with the house.  There are now plenty of people on site each day including bricklayers, plumbers and electricians so things are happening very quickly.  The floor insulation and underfloor heating pipework has been installed and is ready to be screeded, the first of the windows have gone in, the masonry is complete and the roof membrane is on.

I've got some time off work this week to try and sort out various things for the house like the bathroom and kitchen details as well as catching up on paperwork.  Can't wait to be taking time off for something more exciting like painting or laying flooring!

Underfloor heating pipese laid on 150mm polystyrene

One of the first windows installed in the bedroom

Underfloor heating pipes ready for the screed in the main room

Fireplace and fluepipe

Dining Room window

The stairwell is looking very tall

The study and roof membrane are complete